I used my hypercam to take the picture on flickr. Thanks dccradio for it!
A website showing Self Design knex carnival rides. All rides are made from scratch, not from kits, and are all based on real midway rides. Rides light up, and can tear down like the real rides.
Shenandoah shows summary
This blog is a display for my projects. I make models of carnival rides out of knex and pipe cleaners and a few other items. They rack (tear down) like the real rides. If you are viewing this site for the first time let me give you a tour. Below are posts. If your new you might of missed some, so scroll threw and back to see other projects. To the right, is a tab that says pages. Click that and it will take you to a list of pages, including carnival terminology, and youtube, as well as a few others. Enjoy and comment. P.S. if you comment, don't ask me for, or leave any personal info. I ask that you address me as Shenandoah shows, or idog0698. Thank you.
-Shenandoah shows.
-Shenandoah shows.
Showing posts with label Coming soon. Show all posts
Showing posts with label Coming soon. Show all posts
Wednesday, December 24, 2014
COMING SOON!!!!!!???
If you can guess what this ride is, comment and say so. I will reveal the answer in the new year. Its the next edition coming to Shenandoah Shows!
Saturday, July 26, 2014
The skydiver
I am posting about a ride I have had since 7/3/14. I just did some work on it, and put color changing lights on it. So, for the first time ever, I present the skydiver.
up
lights
Racked
up
lights
Racked
The trailer with the cars, braces, and spacers.
Also, the ride list page has been updated. The vertigo has been added, as well as the funnel force and rainbow, 2 I forgot to add.
I also have another brand new ride I will show later. The vertigo. I also plan to make the mulligan wheel. Stay tuned.
Labels:
Coming soon,
new ride,
Newly lit,
newly updated,
Pages,
Ride updates
Thursday, May 15, 2014
Coming soon, silver streak
Yes a new ride will be re built over the next few days. The silver streak Himalaya. Ive built it before, but it was a seasonal ride, so I destroyed it a few months back. Here is a picture of last years version.
Also, I redesigned my wayout swings, so keep a look out for pictures of that, and pictures of the silver streak.
Also, I redesigned my wayout swings, so keep a look out for pictures of that, and pictures of the silver streak.
Labels:
building in progress,
Coming soon
Subscribe to:
Posts (Atom)